15015150026
| Thickness | 5.0mm 8.0mm | ||||||||||||||||
| Surface Finish | Glossy type | ||||||||||||||||
| Service Life | More than 10 years | ||||||||||||||||
| Floor Characteristics | It possesses extremely excellent weather resistance, wear resistance, water resistance and adhesion performance; available in multiple colors with anti-slip surface treatment. Featuring good elasticity and superior weatherability, it is easy to clean, maintain and repair. | ||||||||||||||||
| Scope of Application | ① Sports venues such as courts, tennis courts, basketball courts, volleyball courts and other athletic facilities; | ||||||||||||||||
| ② Children’s playgrounds and kindergarten activity areas; | |||||||||||||||||
| ③ Color coating for pedestrian walkways, residential communities, amusement parks and other similar sites. | |||||||||||||||||
| Construction Process | |||||||||||||||||
| ①Waterproof Layer | The ground shall be completed with waterproof treatment. Outdoor courts must be paved with asphalt waterproofing layer of no less than 5 cm thickness. | ||||||||||||||||
| ②Base Surface Treatment | Grind, repair and remove dust according to the actual condition of the substrate. | ||||||||||||||||
| ③PU Primer | Apply PU primer evenly on asphalt or cement concrete surfaces respectively. The asphalt base shall be cured for about 12 hours; the cement base shall be cured for 1–2 hours after priming. | ||||||||||||||||
| ④PU Intermediate Coat | After the primer is fully cured, trowel one coat of PU intermediate coat to improve the floor wear resistance. | ||||||||||||||||
| ⑤PU Topcoat | Apply one roller coat of PU topcoat and two roller coats of silicon PU topcoat. The finished floor is dustproof, waterproof, wear-resistant, corrosion-resistant and easy to clean with uniform color overall. | ||||||||||||||||
| ⑥Line Marking | Mark court lines with standard 50 mm wide white and yellow PU paint. | ||||||||||||||||
| ⑦Completion of Construction | The venue can be put into use 3 days after construction. (Based on 25℃; the usable time shall be appropriately extended at low temperature. Keep the floor away from water during the curing period.) | ||||||||||||||||
| ⑧ | Stop construction immediately in case of rainy weather during the whole construction process, take timely protective measures and continue curing. | ||||||||||||||||
| Technical Specifications | |||||||||||||||||
| |||||||||||||||||
| Process Diagram | |||||||||||||||||
![]() | |||||||||||||||||
Phone
15015150026
Douyin account
Douyin account
Video Channel
Video Channel
Top