| Thickness | Determined by customer requirements; the thickness of competition-grade plastic track shall be no less than 13mm | ||||||||||||
| Surface Finish | Glossy type | ||||||||||||
| Service Life | More than 10 years | ||||||||||||
| Floor Characteristics | ① All-weather track, unaffected by climatic conditions; available for immediate use after rain. | ||||||||||||
| ② Excellent elasticity, abrasion resistance and anti-slip performance with superior shock absorption, providing a safe sports venue. | |||||||||||||
| ③ Integrated overall structure without joints, featuring attractive color appearance. | |||||||||||||
| ④ Moderate elasticity reduces physical fatigue and improves athletic performance. | |||||||||||||
| ⑤ Long service life with excellent UV resistance, oil resistance, acid and alkali resistance. | |||||||||||||
| Scope of Application | ① Tracks, semicircular areas and auxiliary areas of all kinds of schools, professional stadiums and athletics fields; | ||||||||||||
| ② Ground surface for national fitness trails; | |||||||||||||
| ③ Training tracks for indoor gymnasiums; | |||||||||||||
| ④ Pavement for amusement park paths. | |||||||||||||
| Construction Process | |||||||||||||
| ①Waterproof Layer | The ground shall be completed with professional waterproof treatment. | ||||||||||||
| ②Substrate Treatment | Grind, repair and remove dust according to the actual condition of the base surface. | ||||||||||||
| ③Primer | Apply primer evenly on asphalt or cement concrete surfaces respectively. The base cushion is composed of rubber particles and adhesive. Cure the asphalt base for about 12 hours, and cure the cement base for 1–2 hours after primer application. | ||||||||||||
| ④Topcoat | The surface layer is mixed with polyurethane or fine EPDM particles, and mechanically sprayed onto the cushion layer to form an anti-slip surface. The finished track is dustproof, waterproof, wear-resistant, corrosion-resistant and easy to clean with uniform overall color. | ||||||||||||
| ⑤Line Marking | Mark lines in accordance with standard track specifications. | ||||||||||||
| ⑥Completion & Commissioning | The track can be put into use 3 days after construction. (Reference temperature: 25℃; the opening time shall be appropriately extended at low temperature. Keep the track free of water during the curing period.) | ||||||||||||
| ⑦ | Stop construction immediately in case of rainy weather during construction, take timely protective measures and continue curing properly. | ||||||||||||
| Technical Specifications | |||||||||||||
| |||||||||||||
| Process Diagram | |||||||||||||
![]() | |||||||||||||