| Thickness | 1.0mm 2.0mm 3.0mm | ||||||||||||||||||||||||||||||||||||||||
| Surface Finish | Self-leveling trowel finish, roller finish, glossy type | ||||||||||||||||||||||||||||||||||||||||
| Service Life | More than 10 years | ||||||||||||||||||||||||||||||||||||||||
| Floor Characteristics | The surface is flat and seamless, dust-free and easy to clean. It features good mechanical strength and excellent chemical resistance, and can withstand high-concentration sulfuric acid. | ||||||||||||||||||||||||||||||||||||||||
| Scope of Application | ① Chemical plants, electroplating factories, battery factories, sewage treatment plants, etc.; | ||||||||||||||||||||||||||||||||||||||||
| ② Sites with stringent requirements for anti-corrosion performance. | |||||||||||||||||||||||||||||||||||||||||
| Construction Process | |||||||||||||||||||||||||||||||||||||||||
| ①Waterproof Treatment | The ground floor shall be completed with waterproofing works in advance. | ||||||||||||||||||||||||||||||||||||||||
| ②Base Surface Treatment | Repair, grind and remove dust according to the actual condition of the substrate. | ||||||||||||||||||||||||||||||||||||||||
| ③Epoxy Primer | Roll-coat 1 to 2 coats of epoxy primer with excellent permeability and adhesion to improve the strength and bonding performance of the base. | ||||||||||||||||||||||||||||||||||||||||
| ④Special Anti-corrosion Primer | Apply one roller coat of sealing-type special anti-corrosion primer with strong adhesion to enhance the bonding strength between the base surface and fiberglass cloth. | ||||||||||||||||||||||||||||||||||||||||
| ⑤Fiberglass Cloth Laying | Lay fiberglass cloth flat on the floor. Adhere the cloth with prepared special anti-corrosion intermediate coating, then level evenly with a trowel for uniform coverage to improve floor toughness. Lay 1 to 3 layers as required. | ||||||||||||||||||||||||||||||||||||||||
| ⑥Special Anti-corrosion Intermediate Coat | Mix special epoxy intermediate coating with appropriate quartz sand, and apply evenly 1 to 3 coats with a trowel. | ||||||||||||||||||||||||||||||||||||||||
| ⑦Special Anti-corrosion Putty | Apply 2 to 3 coats as required until the surface is flat and pore-free, providing a good base for topcoat construction. | ||||||||||||||||||||||||||||||||||||||||
| ⑧Special Anti-corrosion Color Coat | Apply two roller coats of special anti-corrosion color paint to achieve uniform color. | ||||||||||||||||||||||||||||||||||||||||
| ⑨Special Anti-corrosion Topcoat | Trowel one coat of special anti-corrosion self-leveling topcoat, or apply two roller coats of special anti-corrosion clear topcoat. The finished floor is bright, clean and uniform in color. | ||||||||||||||||||||||||||||||||||||||||
| ⑩Completion & Curing | Pedestrian access is allowed after 24 hours; heavy load access after 72 hours; official use permitted after 7 days of curing. (Based on 25℃ standard temperature; the accessible time shall be appropriately extended at low temperature. Keep the floor free of water during the curing period.) | ||||||||||||||||||||||||||||||||||||||||
| Technical Specifications | |||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||
| Chemical Resistance Performance: | |||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||
| Process Diagram | |||||||||||||||||||||||||||||||||||||||||
![]() | |||||||||||||||||||||||||||||||||||||||||