15015150026
| Thickness | 1.0mm 2.0mm 3.0mm | ||||||||||||||||||
| Surface Finish | Self-leveling trowel finish, roller finish, glossy finish | ||||||||||||||||||
| Service Life | 10 years | ||||||||||||||||||
| Floor Characteristics | Vinyl ester resin possesses the excellent physical properties of epoxy resin, as well as the fast curing speed and easy workability of unsaturated polyester. It delivers outstanding chemical resistance and superior corrosion resistance against most acid, alkali and solvent environments. | ||||||||||||||||||
| Scope of Application | ① Electroplating plants, battery factories and chemical plants; | ||||||||||||||||||
| ② Chemical storage areas, tank trenches, large water tanks, electrolytic cells, etc.; | |||||||||||||||||||
| ③ Sewage and wastewater treatment tanks, acid-base neutralization tanks. | |||||||||||||||||||
| Construction Process | |||||||||||||||||||
| ①Waterproof Treatment | Waterproofing shall be completed for ground floors on the first floor. | ||||||||||||||||||
| ②Substrate Treatment | Repair, grind and remove dust according to the actual condition of the base surface. | ||||||||||||||||||
| ③Epoxy Primer | Apply 1 to 2 roller coats of epoxy primer with high permeability and adhesion to enhance the strength and bonding performance of the substrate. | ||||||||||||||||||
| ④Vinyl Ester Primer | Apply one roller coat of high-adhesion vinyl ester resin compound mixed with appropriate thinner to strengthen the bonding force between the substrate and fiberglass cloth. | ||||||||||||||||||
| ⑤Fiberglass Cloth Laying | Lay the fiberglass cloth flat on the floor, adhere it with mixed vinyl ester intermediate coating, and level evenly with a trowel. Apply 1 to 3 layers as required. | ||||||||||||||||||
| ⑥Vinyl Ester Intermediate Coat | Apply 1 to 2 even coats of mixed vinyl ester intermediate paint with a trowel. | ||||||||||||||||||
| ⑦Vinyl Ester Putty | Apply two even coats of prepared vinyl ester intermediate paint with a trowel. | ||||||||||||||||||
| ⑧Vinyl Ester Topcoat | Trowel one coat of mixed vinyl ester self-leveling topcoat, or roll two coats of vinyl ester roller topcoat. The finished floor features a bright, clean and uniform color appearance. | ||||||||||||||||||
| ⑨Completion of Construction | Pedestrian access is allowed after 24 hours; heavy load access is permitted after 72 hours; formal commissioning is available after 7 days of curing. (Based on 25℃ standard temperature; the accessible time shall be appropriately extended at low temperature. Keep the floor free of water during the curing period.) | ||||||||||||||||||
| Technical Specifications | |||||||||||||||||||
| |||||||||||||||||||
| Process Diagram | |||||||||||||||||||
![]() | |||||||||||||||||||
Phone
15015150026
Douyin account
Douyin account
Video Channel
Video Channel
Top