15015150026

Suitable locations and construction conditions for water-based epoxy flooring

Executive Editor:Guangdong Jinfeng New Material Technology Co., Ltd Responsibility publication time:2025-11-27
  

Construction conditions for water-based epoxy flooring:


1. Chisel and clean the cement mortar on the ground. If there are grease impurities on the ground, use a solvent to wipe it clean.


2. The original cement floor requires hardness, smoothness, and no sanding. If there are hollowing, peeling, sanding, cracks, etc. on the floor, they must be treated according to the requirements before construction can begin. If the original ground is a smooth surface such as terrazzo or floor tiles, it needs to be chiseled into a rough surface first.


3. As long as there is no water accumulation or obvious leakage, construction can be carried out. The relative humidity at the construction site should be below 85%, and the ambient temperature should be above 10 ℃.


Contact Us—— Business covers major, medium and small cities across China as well as Southeast Asian countries.
Guangdong Jinfeng New Material Technology Co., Ltd.
Address: Room 1909, Building 5, Huixing Commercial Building, Shilong Town, Dongguan City, Guangdong ProvinceContact Person: Ms. Wang 15015150026Website: /Email:1841896008@qq.com
Taiwan Branch Office
Address:6th Floor, No. 23, Lane 17, Section 1, Touzhang Road, Toujia Village, Tanzi Township, Taichung City, Taiwan
Tel:00886-4-25326538
Fax:00886-4-25326538
Headquarters Production Base
Address: Zhuli Industrial Zone, Shiwan Town, Huizhou City, Guangdong Province (Jinfeng Company)
Tel: Ms. Wang 15015150026
  • Jinfeng Tiktok
  • WeChat Channels
Consulting service

Phone

Business Inquiry

15015150026

Douyin account

Douyin account

Video Channel

Video Channel

Top

Consulting service