Answer: Reason: During the construction of epoxy flooring, the spacing is too long and the material solidifies too quickly. Improper selection of construction tools or personnel
Solution: Construction personnel should line up as much as possible, work at the same time, and the height difference should not exceed 3M. Strictly follow the product manual, choose the appropriate curing agent, and use professional tools and a professional construction team during construction
Phone
15015150026
Douyin account
Douyin account
Video Channel
Video Channel
Top