Answer: Reason: During the construction of epoxy flooring, the thickness of the material is uneven, and it is necessary to maintain the same batch number. The construction time interval before and after production is too long
Solution: During construction, it is necessary to apply the final coat of paint evenly and maintain the same batch number and production area to avoid staged construction
Phone
15015150026
Douyin account
Douyin account
Video Channel
Video Channel
Top