15015150026
| Thickness | 0.5mm 1.0mm 2.0mm 3.0mm | ||||||||||||||||||||||||||||
| Surface Finish | Self-leveling trowel finish, roller coated type, glossy type | ||||||||||||||||||||||||||||
| Service Life | 0.5mm: Over 2 years, 1.0mm: 5~8 years, 2.0mm: Over 8~10 years, 3.0mm: Over 10~15 years | ||||||||||||||||||||||||||||
| Floor Characteristics | Smooth and glossy surface with durable and excellent anti-static performance; dustproof, moisture-proof and wear-resistant. | ||||||||||||||||||||||||||||
| Scope of Application | ① Communication equipment and precision electronics manufacturing plants; | ||||||||||||||||||||||||||||
| ② Military factories and hazardous chemical warehouses; | |||||||||||||||||||||||||||||
| ③ Factory floors requiring high-standard anti-static performance. | |||||||||||||||||||||||||||||
| Construction Process | |||||||||||||||||||||||||||||
| ①Waterproofing Treatment | Waterproofing work shall be completed for ground floors on the first floor. | ||||||||||||||||||||||||||||
| ②Base Surface Treatment | Grind, repair and remove dust according to the actual condition of the substrate. | ||||||||||||||||||||||||||||
| ③Static Conductive Primer | Roll 1 to 2 coats of static conductive epoxy primer with high permeability and adhesion to enhance surface bonding strength. | ||||||||||||||||||||||||||||
| ④Copper Foil Laying | Lay conductive copper foil in a grid pattern to effectively release accumulated static electricity and complete grounding treatment. | ||||||||||||||||||||||||||||
| ⑤Static Conductive Intermediate Coat | Apply several even coats of static conductive intermediate material with a trowel. | ||||||||||||||||||||||||||||
| ⑥Static Conductive Putty | Apply two coats of static conductive putty until the surface is flat and pore-free without trowel marks and sanding marks. | ||||||||||||||||||||||||||||
| ⑦Static Conductive Topcoat | Trowel one coat of static conductive self-leveling topcoat or roll-coat two coats. Its volume/surface resistivity ranges from 5×104~1×106 Ω. The finished floor is bright, clean and uniform in color. | ||||||||||||||||||||||||||||
| ⑧Completion of Construction | Pedestrian access is allowed after 24 hours; heavy load access is permitted after 72 hours. (Based on 25℃ standard temperature; the accessible time shall be properly extended at low temperature. Keep the floor free of water during the curing period.) | ||||||||||||||||||||||||||||
| Technical Specifications | |||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||
| Process Diagram | |||||||||||||||||||||||||||||
![]() | |||||||||||||||||||||||||||||
Phone
15015150026
Douyin account
Douyin account
Video Channel
Video Channel
Top