15015150026
Anti corrosion fiberglass epoxy flooring (self leveling type, rolling type)

Anti corrosion fiberglass epoxy flooring (self leveling type, rolling type)

 Details
Thickness1.0mm 2.0mm 3.0mm
Surface FinishSelf-leveling trowel finish, roller finish, glossy finish
Service LifeMore than 10 years
Floor CharacteristicsReinforced with glass fiber for enhanced tensile strength; non-toxic, odorless, and features excellent resistance to acid, alkali and chemical solvents.
Scope of Application① General chemical storage tanks;
② Crack-proof flooring, pharmaceutical factories, power plants, non-ferrous metal plants;
③ Premises with special requirements for anti-corrosion performance.
Construction Process
①Waterproofing TreatmentWaterproofing work shall be completed for ground floors on the first floor.
②Base Surface TreatmentGrind, repair and remove dust according to the actual condition of the base surface.
③Epoxy PrimerRoll-coat 1 to 2 coats of epoxy primer with high permeability and adhesion to improve base strength and bonding performance.
④Anti-corrosion Epoxy Sealer PrimerApply one coat of sealing anti-corrosion epoxy primer with strong adhesion to strengthen the bonding force between the surface and glass fiber cloth.
⑤Glass Fiber Cloth LayingLay the glass fiber cloth flat, adhere it to the floor surface with mixed epoxy intermediate coat, then level the material with a putty knife for even coverage. This improves floor toughness; apply 1 to 3 layers as required.
⑥Anti-corrosion Epoxy Intermediate CoatMix epoxy intermediate coat with appropriate quartz sand, and apply evenly 1 to 3 coats with a trowel.
⑦Anti-corrosion Epoxy PuttyApply 2 to 3 coats as needed until the surface is flat and pore-free to facilitate topcoat construction.
⑧Anti-corrosion Epoxy Color CoatRoll-coat two coats of anti-corrosion epoxy color paint to achieve uniform color.
⑨Anti-corrosion Epoxy TopcoatApply one trowel coat of anti-corrosion epoxy self-leveling topcoat, or two roller coats of anti-corrosion clear topcoat. The finished floor is bright, clean and uniform in color.
⑩Completion of ConstructionPedestrian access allowed after 24 hours; heavy load access permitted after 72 hours. The floor can be put into official use after 7 days of curing. (Based on 25℃; the curing time shall be appropriately extended at low temperature. Keep the floor free of water during the maintenance period.)
Technical Specifications
ItemIndex
Surface Drying Time (h)≤4
Hard Drying Time (h)≤24
Hardness (Shore Type D)≥80
Wear Resistance (750g/500r, Weight Loss, g)≤0.03
Compressive Strength (MPa)≥80
Tensile Strength (MPa)≥100
Bonding Strength (MPa)≥3
Note: Refer to Appendix 2 for anti-corrosion performance.
Process Diagram
12.jpg


Contact Us—— Business covers major, medium and small cities across China as well as Southeast Asian countries.
Guangdong Jinfeng New Material Technology Co., Ltd.
Address: Room 1909, Building 5, Huixing Commercial Building, Shilong Town, Dongguan City, Guangdong ProvinceContact Person: Ms. Wang 15015150026Website: /Email:1841896008@qq.com
Taiwan Branch Office
Address:6th Floor, No. 23, Lane 17, Section 1, Touzhang Road, Toujia Village, Tanzi Township, Taichung City, Taiwan
Tel:00886-4-25326538
Fax:00886-4-25326538
Headquarters Production Base
Address: Zhuli Industrial Zone, Shiwan Town, Huizhou City, Guangdong Province (Jinfeng Company)
Tel: Ms. Wang 15015150026
  • Jinfeng Tiktok
  • WeChat Channels
Consulting service

Phone

Business Inquiry

15015150026

Douyin account

Douyin account

Video Channel

Video Channel

Top

Consulting service