15015150026
Thickness: Penetrating at least 5.0mm
Surface morphology: shiny
Service life: 20 years
Scope of application: Suitable for various parking lots, but applicable to floors with low dust resistance requirements
construction technology
① Ground treatment: Clean and remove debris and oil stains from the original ground before construction. Using cement-based polymer grout to repair large cracks in the ground to reduce the loss of raw materials. If the ground is rough, a layer of fine cement slurry needs to be scraped;
② Polishing the ground: If the ground strength is not sufficient, apply a layer of primer first and use 50, 150, and 300 grit grinding discs to polish until the ground is smooth. For floors with good strength, first use a 500 grit grinding disc to grind the floor, apply a layer of primer, and grind until the floor is smooth. After grinding the ground, clean it thoroughly with water. After 6 hours of construction, personnel can start working, but there should be no visible or accumulated water on the ground;
③ Primer (reinforcing agent): After the ground is cleaned, let the surface air dry for 30-60 minutes until there is no visible water on the surface before applying the primer (reinforcing agent). Use a spray to evenly spray the proportioned hardener on the ground, and use a rubber broom or scraper to sweep evenly at the same time. Spray continuously onto the dry surface of the ground and keep it moist for 30 minutes, but there should be no accumulation of material. If there is a whitening phenomenon on the ground after the surface is dry, a mop should be used to apply another layer of primer (reinforcing agent). After 6 hours of construction, people can work on it, but there should be no visible or accumulated water on the ground. After 24 hours of applying the primer (reinforcing agent), the next step is to apply the topcoat (protective agent);
④ Topcoat (protective agent): First, use an 800, 1000 mesh, or 2000 mesh grinding disc to polish the floor until it is smooth and tender. Then, clean the floor thoroughly and let it air dry for 10-20 minutes. Use a mop to evenly apply the topcoat (protective agent) to the ground, and after the surface dries, use a high-speed polishing machine to polish it until the surface is smooth and shiny; After the first coat of paint is completed, apply another coat of paint (protective agent), and then use a high-speed polishing machine to polish the surface until it is smooth and shiny;