1. To check whether the ground is flat, mark the ground that is too high or too low for polishing and repair. We usually use a 2m ruler for measurement and record the gap difference.
2. Before construction, it is necessary to understand the maintenance time of the ground, whether the waterproof layer at the bottom is under construction, and the weather conditions during construction. Because epoxy flooring is not suitable for construction in excessively cold or humid environments, generally speaking, a curing time of 7 days is appropriate in summer, and 10 days is needed if the weather is cold or humid. The detection of moisture content is to prevent excessive moisture content from affecting the adhesion of the coating after construction.
3. In order to prevent coating defects such as sanding and hollowing after construction, we usually conduct a concrete strength check before construction. 4. Check if the construction environment is clean and enclosed. If not sealed, dust will blow into the construction floor, causing it to appear granular and uneven. Also, construction cannot be carried out in excessively cold environments. To avoid affecting the coating effect.
Phone
15015150026
Douyin account
Douyin account
Video Channel
Video Channel
Top