Before construction, the surface strength and flatness of the floor should be checked to meet the construction requirements of epoxy resin. If the floor has sanding or insufficient strength, reasonable suggestions should be made to the customer for reinforcement treatment; If the flatness does not meet the requirements, it is recommended that the customer first carry out cement self leveling construction. During the first layer construction, the moisture content of the first layer base surface should be tested.
Phone
15015150026
Douyin account
Douyin account
Video Channel
Video Channel
Top