Answer: Reason: After the construction of the epoxy floor, it was not completely cured before starting to be used. The temperature was too low and the humidity was too high, resulting in incomplete curing
Solution: In general, people can only enter after 24 hours of completion, and heavy pressure can only be applied after 72 hours. (Based on 25 ℃, the low-temperature opening time should be moderately extended, and the floor should not be wet during the maintenance period.) Choose an appropriate curing agent, and construction can only be carried out when the humidity is below 80%
Phone
15015150026
Douyin account
Douyin account
Video Channel
Video Channel
Top