Jinfeng Epoxy Floor Lecture Hall: Method of using fireproof coating: 1. The thickness of each coat of fireproof coating primer is 0. 2mm -0. 3mm, brushing distance 8-12 hours. If the weather is humid and the humidity is high, the brushing time of the next coat of paint can be extended according to practical conditions to ensure that the previous coat of paint is dry before brushing the next coat of paint. (Request to brush flat).
2. This product is divided into two types: primer and topcoat. Before applying the primer, it is heated directly (in a water bath) until it is completely transparent and stirred evenly before being applied. It can be sprayed or brushed.
3. Before construction, the surface of the substrate should be cleaned and cleared. If the substrate has been painted, it should be peeled off or sanded with sandpaper. The front of the exposed wooden substrate can be painted.
4. The reference practical usage is 500 ɡ ÷ ㎡. After the primer is completely dry, apply two coats of topcoat to ensure flatness and aesthetics. The construction environment temperature should be between 5-35 ℃, and the absolute humidity should be below 40%.
If you have any needs in this regard, please contact us in a timely manner, and we will provide you with the best service. Jinfeng Epoxy Flooring National Free Hotline: 400-856-1101 ext. 8902 Website: p.jinfengpaint.com/
Phone
15015150026
Douyin account
Douyin account
Video Channel
Video Channel
Top