Dongguan epoxy flooring is composed of epoxy floor paint mixed with curing agent. Epoxy resin features excellent physical and mechanical properties, electrical insulation, acid and alkali resistance, chemical resistance and strong bonding performance. It can penetrate directly into the base ground, form superior bonding with the substrate, improve the compression resistance of the floor, and extend its service life. After the application of epoxy resin, the floor surface becomes bright, dustproof and offers many other advantages. Therefore, epoxy flooring is the optimal solution for workshop and factory floors.
Beautiful appearance, clean overall effect, easy maintenance, dustproof and ash-proof performance.
Epoxy flooring is consolidated by epoxy floor paint and super-hard quartz sand. It boasts ultra-high strength, heavy load resistance, impact resistance, wear resistance and strong adhesion. It is also dustproof, moisture-proof, waterproof, anti-corrosive and mildew-proof. The finished surface is flat, smooth and easy to clean. It is available in high-gloss and anti-slip finishes, and is highly suitable for low-temperature and humid environments.
Walls and floors of schools, electronics factories, electrical workshops, hardware workshops, machinery factories, chemical plants, laboratories, food factories, textile mills, supermarkets, parking lots and other industrial workshops.
Waterproof Treatment: Waterproofing must be completed for ground floors.
Base Surface Treatment: Grind, repair and remove dust according to the actual condition of the original base.
Epoxy Primer: Apply one roller coat of high-permeability and high-adhesion epoxy primer to enhance surface bonding force.
Epoxy Intermediate Coat: Mix epoxy resin with an appropriate amount of quartz sand, and apply several even coats with a trowel.
Epoxy Putty Coating: Apply multiple coats as required until the surface is flat, free of holes, trowel marks and sanding traces.
Epoxy Topcoat: Apply two roller coats of solvent-based epoxy topcoat or anti-slip topcoat. The finished floor shall be bright, clean, uniform in color and free of hollowing.
Curing Period: Pedestrian access is allowed after 24 hours; heavy load traffic is permitted after 72 hours.
Phone
15015150026
Douyin account
Douyin account
Video Channel
Video Channel
Top